A fleet maintenance problem modeling tyre condition transitions between classes A, B, C, and D as a Markov chain with monthly inspections. The solution compares the expected cost of waiting for road failures (USD 1000 each) against replacing class C tyres at inspection (USD 800 each) to find the most economical policy.
Question
Act as an expert maths tutor. Before you give me the final answer, please break it down into these four steps: 1. *Core Concept:* Explain the underlying principle 2. *Formula Needed:* State the exact formula in clean, simple terms. 3. *Step-by-Step Working:* Show the calculation step-by-step, explaining why you add, subtract 4. *Final Answer:* Clearly bold the final figure/answer
Answer
1. Core Concept
- Policy 1 (wait): the tyre stays in C until it fails on the road, costing USD 1000.
- Policy 2 (replace at inspection): the tyre is replaced in the shop as soon as it is found in class C, costing USD 800.
2. Formula Needed
3. Step-by-Step Working
- From A: stays A with 0.7, moves to B with 0.2, moves to C with 0.1 (the remaining probability, since the row must sum to 1).
- From B: stays B with 0.8, moves to C with 0.2.
- From C: stays C with 0.2, fails with 0.8 (failures are replaced on the road).